When excavating an underground foundation pit (trough), reasonably determine the excavation sequence and layered excavation depth. When it is close to the groundwater level, the excavation at the lowest elevation should be completed first to facilitate centralized drainage at this place. After excavation, when digging to within 50cm from the bottom of the trough, a horizontal line 50cm from the bottom of the trough should be marked. From the end of each trough 20cm, small wooden prongs are nailed at the level of the trough side every 2-3m. When the excavation is close to the bottom elevation of the trough, use a ruler or a 50cm standard ruler beforehand, and use a small wooden prong to level the elevation of the trough bottom at any time. Finally, the two ends of the axis (center line) lead the pile to pull the line, check the dimension from the groove edge, determine the groove width standard, repair the groove according to this, finally remove the soil at the bottom of the groove, smooth the pile head and extend the cushion 50mm, Repair the bottom and shovel level.
正在翻译中..