The sluice is a sluice built on a plain river, which is mainly used for irrigation, flood control and drainage. The discharge water is discharged to the downstream through the gate, so the gate design must meet the above requirements. Firstly, the size of the gate opening, gate, gate base plate and other infrastructure is designed. The gate width is 8.0m, and the height is 6.7m. The total net width of the gate chamber is 45.6m. Check the stability of the above buildings to make them meet the requirements of relevant regulations. If it does not meet the requirements, it shall be modified until it meets the requirements. The main facilities of the project include gate, gate base plate, energy dissipation facilities, gate pier, working bridge, traffic bridge and retaining wall, etc. Then, the reinforcement calculation of the sluice floor is carried out, the single hole and one joint are selected as the research object, and the elastic foundation beam method is used for the design calculation, and the required reinforcement area is calculated. Finally, the design of retaining wall is carried out.<br>
正在翻译中..