Product Information1. Variation Handling and Change Over1.1 This equipment should be able to handle and process multiple product types with the capability of processing all of them to the throughput specified.1.2 This specification document highlights two of the known product sizes that the supplier should include in the quote and range of possible product sizes. The known product sizes are: small battery (TAM), current large size battery (SHASTA).1.3 All tooling required to produce Small and Large Cells at the Required Throughput shall be included in the quoted scope of supply.1.4 This equipment should be able to process other Product Types, between the Smallest and the Largest Cell inclusively Section 4 Cell (View before Vacuum Bake)1.4.1 Additional tooling and programs may be required to produce other Product Types.2. Setup Change2.1 The equipment does not need to run multiple product types simultaneously.2.2 Setup change or changeover time between two product types is acceptable.2.3 The time required to change setup on the machine (when machine needs to stop production) should be no more than 8 person hours (i.e. 4 people in 2 hours) for the Overall Packaging Process as defined in Section 5 Overall Packaging Proces.3. Required Throughput3.1 Equipment should have proven and demonstrated capability of Throughput of 18 Parts per Minute (PPM) or 1080 Parts per Hour (PPH), after applying Overall Equipment Effectiveness (OEE) of 85%.3.2 This Required Throughput should be sustainable long term with pre-determined Preventative Maintenance (PM) defined by supplier.3.2.1 Any prescribed PM activity duration and frequency shall fall within OEE of 85%. See section Overall Equipment Effectiveness in General Equipment Requirements document for OEE calculation as it pertains to Enovix projects.