The sea water inlet for these pumps to be arranged from a point well forward of all grey water and black water discharges.Swimming pool sea water filling pipe to have an emergency connection from Fire/Wash Deck pump.Quick dumping arrangement (clear of life boats) to be provided for all pools so that the contents are dumped in a maximum of 10 minutes. Swimming pools to be pressure tested and “emergency dumped” tested before application of tiles and/or decorative fittings.