Lining the maintenance of the principle is the new pipe lining on the inner wall of the original pipe, tube diameter smaller than the original. However, because of piping materials, the carrying capacity of the new pipeline might not have much difference with the original drainage capacity. The advantage of this method of construction is little traffic impact on road traffic and other underground. But its drawback is that, when there is a large displacement and deformation of the pipeline, can not achieve the desired results. The new pipeline diameter and slope depends entirely on the relevant characteristics of the old pipe.