5 Status of the product after test→ Decide whether or not the UPS must be scrapped after tests• The product can be reused if all tests are passed without any failure and any damage.• In order to reduce Hi-pot test times, make sure the dielectric test at last step before re-do ATE PC final testing. Do not do Hi-pot test again after Surveillance test.