3.2.8.4 When working without a fully boarded level / platform or without a single guardrail protection that scaffolds remain tied off /clipped on to a suitable anchor point.3.2.8.5 Every suspension rope, including hardware used on nonadjustable suspension scaffolds, must be capable of supporting, without failure, at least 6 times the maximum intended load.3.2.8.6 All suspension scaffold support devices, such as outrigger beams, cornice hooks, parapet clamps, and similar devices rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating at the rated load of the hoist.3.2.8.7 Suspension scaffold outrigger beams will be: Provided with stop bolts or shackle at both ends. Securely fastened together with the flanges turned out when channel iron beams are used in place of I-beams. Installed with all bearing support perpendicular to the centerline. Set and maintained with the web in a vertical position.3.2.8.8 When an outrigger beam is used, the shackle or clevis with which the rope is attached to the outrigger beam is placed directly over the centerline of the stirrup.3.2.8.9 When wire rope clips are used on suspension scaffold: There will be a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart. When U-bolt clips are used, the U-bolt will be placed over the dead end of the rope; and the saddle will be placed over the live end of the rope. Manufacturer’s recommendation will be consulted before torqueing bolts.