(3)确定合理的主接线方案、运行方式及限流措施。 (4)保护电力系统的电气设备在最严重的短路状态下不损坏,尽量减少因短路故障产生的危害。  的英语翻译

(3)确定合理的主接线方案、运行方式及限流措施。 (4)保护电力系统的

(3)确定合理的主接线方案、运行方式及限流措施。 (4)保护电力系统的电气设备在最严重的短路状态下不损坏,尽量减少因短路故障产生的危害。 4.1.2 短路电流计算一般规定 (1) 应按工程的设计规划容量计算,并考虑电力系统的远景发展规划,一-般为本期工程建成后5~10年。(2)确定短路电流计算时,应按可能发生最大短路电流的正常接线方式,而不应仅按在切换过程中可能并列运行的接线方式。(3)在各种短路类型中应选短路类型最严重的情况,一般按照三相短路进行计算。(4)在正常接线方式时通过设备的短路电流为最大的地点,称为短路计算点。(5)在工程设计中,短路电流计算-般采用实用计算, 即在一定的假 设条件下算出短路电流的各个分量。 4.1.3 短路电流计算基本假设(1) 正常工作时,三相系统对称运行:(2)所有电源的电动势相位角相同:(3)电力系统中各元件的磁路不饱和,即带铁芯的电气设备电抗值不随电流大小发生变化:(4)不考虑短路点的电弧阻抗和变压器的励磁电流:(5)元件的电阻略去,输电线路的电容略去不计,及不计负荷的影响:(6)系统短路时是金属性短路。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
(3) Determine a reasonable main wiring scheme, operation mode and current limiting measures. <br>(4) Protect the electrical equipment of the power system from damage in the most serious short-circuit state, and minimize the harm caused by short-circuit faults. <br>4.1.2 General provisions for short-circuit current calculation <br>(1) It should be calculated according to the design planning capacity of the project, and the long-term development plan of the power system should be considered, generally 5-10 years after the completion of the current project. <br>(2) When determining the calculation of short-circuit current, the normal wiring method that may cause the maximum short-circuit current should be used, not just the wiring method that may be operated in parallel during the switching process. <br>(3) Among the various short-circuit types, the most serious type of short-circuit type should be selected, generally calculated according to the three-phase short-circuit. <br>(4) The place where the short-circuit current through the device is the largest in the normal wiring mode is called the short-circuit calculation point. <br>(5) In engineering design, short-circuit current calculation generally adopts practical calculation, that is, calculates each component of short-circuit current under certain assumptions. <br>4.1.3 Basic assumptions for short-circuit current calculation <br>(1) During normal operation, the three-phase system operates symmetrically: <br>(2) The phase angle of the electromotive force of all power supplies is the same: <br>(3) The magnetic circuit of each component in the power system is not saturated, that is, with a core The reactance value of the electrical equipment does not change with the current size: <br>(4) The arc resistance of the short circuit point and the excitation current of the transformer are not considered: <br>(5) The resistance of the component is omitted, the capacitance of the transmission line is omitted, and the effect of the load is ignored: <br>(6) When the system is short-circuited, it is a metallic short circuit.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
(3) To determine a reasonable main wiring scheme, mode of operation and current restriction measures. <br>(4) Protect the electrical equipment of the power system from damage in the most severe short-circuit state, and minimize the damage caused by short circuit failure. <br> 4.1.2 General regulations for short-circuit current calculation<br> (1) Should be calculated according to the design and planning capacity of the project, and consider the vision development plan of the power system, one - for the completion of the project 5 to 10 years.<br>(2) When determining the short-circuit current calculation, the normal wiring mode of the maximum short-circuit current may occur should be, and not only in the same way that may be run side by side during the switching process.<br>(3) In the case of the most serious short-circuit type should be selected in various short-circuit types, it is generally calculated according to the three-phase short circuit.<br>(4) The short-circuit current through the device is the largest location in normal wiring mode, called the short-circuit calculation point.<br>(5) In engineering design, short-circuit current calculation - like the use of practical calculation, that is, under certain false conditions to calculate the short-circuit current components.<br> 4.1.3 Basic assumptions for short-circuit current calculation<br>(1) When working normally, the three-phase system operates symmetrically:<br>(2) The electric potential phase angle of all power supplies is the same:<br>(3) The magnetic circuit of each component in the power system is not saturated, i.e. the electrical resistance value of the electrical equipment with iron core does not change with the current size:<br>(4) The arc impedance of the short circuit point and the excitation current of the transformer are not considered:<br>(5) the resistance of the component is omitted, the capacitance of the transmission line is omitted, and the effect of the load is not counted:<br>(6) The system is shorted to metal.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
(3) Determine the reasonable main wiring scheme, operation mode and current limiting measures.<br>(4) Protect the electrical equipment of the power system from damage in the most serious short-circuit state, and minimize the harm caused by short-circuit fault.<br>4.1.2 general provisions for short circuit current calculation<br>(1) It shall be calculated according to the design planning capacity of the project, and the long-term development plan of the power system shall be considered. Generally, it is 5-10 years after the completion of the project.<br>(2) When determining the short-circuit current calculation, the normal wiring mode that may produce the maximum short-circuit current shall be followed instead of the wiring mode that may operate in parallel during the switching process.<br>(3) In all kinds of short-circuit types, the most serious short-circuit type should be selected, generally calculated as three-phase short-circuit.<br>(4) In the normal wiring mode, the maximum short-circuit current passing through the equipment is called the short-circuit calculation point.<br>(5) In engineering design, short-circuit current calculation generally uses practical calculation, that is, under certain assumptions to calculate the various components of short-circuit current.<br>4.1.3 basic assumptions of short circuit current calculation<br>(1) In normal operation, the three-phase system operates symmetrically:<br>(2) All power supplies have the same EMF phase angle:<br>(3) The magnetic circuit of each component in the power system is not saturated, that is, the reactance value of electrical equipment with iron core does not change with the current size:<br>(4) The arc impedance at the short circuit point and the excitation current of the transformer are not considered:<br>(5) The resistance of components is omitted, the capacitance of transmission lines is omitted, and the influence of load is ignored:<br>(6) The short circuit of the system is metallic.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: