The production beat of the cab line is 2:30s, and the average inspection beat is 2:40s; the production beat of the main line is 5 minutes, and the maximum inspection beat is 5:10s, and the work saturation is seriously out of standard, which causes the inspector to inspect according to experience, and the problems of non concerned parts flow out<br>If there is no reasonable work and rest time, such as physiological needs or other problems that need to be handled after leaving the post, the vehicle will be missed.<br>
正在翻译中..