Box appearance inspection, performance testing, checking the specifications of the isolation transformers used in various lamps and marking them, connecting the secondary cable connector and the secondary cable, cleaning the light box, painting the light box, installing the transformer, grounding connection, installing the box cover
正在翻译中..