1. Make sure the project name correspondence relationship with the picture is correct; <br>2, please provide a stadium plan and related structural dimensions; <br>3, the stadium roof openings 4 responsibility of the Party, the offer does not contain this section, outside the stadium roof to ground level how many? <br>4, four point location of the tower and is positioned by Party written delivery chain line; <br>a base position and a column base bearing capacity of 5,4? Wind load is calculated in accordance with 8? <br>6, the correspondence table in Appendix A refers to the 12-meter height above the roof rack? <br>7, the connection node between the top rack and cable provided by the camera team? We are only responsible for the installation? <br>8, the interior of the tower if required Master channel? <br>9, installation and removal of construction, the roof around the tower needs to be done if there is security and cover? Protection requirements? Master roofing materials and roof when the load limit is how much?
正在翻译中..