Look at tooling / test fixtures and drawing control for each. Release of tool test fixture drawings.SCORING:0 = Do not have allocated resource for test fixture design / process1 = Do have allocation. Evidence of gaps in the test fixture control, release and maintenance process2 = Robust test fixture design process - Design, build , release, and maintenance