TomWe do need to make these changes to the lower brackets, JLR is design responsible and this is part of their final design. The tooling being finished without a final print, actually helps us but we still need to find out what it will take to modify it to the final released version. Here’s what we need to do:1. Run enough parts from the new tool to cover TT build (5 vehicle sets needed), we need these assemblies by Oct 25th (per the original timing to complete the tooling before we found out Karlang had completed it). JLR will accept uncoated parts if that meets the timing.2. We also need to run enough to do a measurement study, there is a chance the tolerances my allow us not to take the 0.5mm off the bottom of the part.3. Determine if the existing tool can be modified to make parts to the new design, released last week. a. If so, how long will a it take to modify the tool.i. If there are small changes we can suggest to make this happen we can sure suggest them.b. If not, how long will it take to make a new tool.4. What needs to change beyond the casting tool and timings to make those changes.JLR is watching this closely and we need a plan together by the time talk on Tuesday.ThanksJames