8.7.6 For the removal of stockpiled public fill at the decommissioning stage, it is estimated that about 90% of the stockpiled materials will be delivered off site by barges. As the barging point will be partially enclosed to screen the loading operations from the VSRs, the visual effects of the unloading operation will not be significant. Since the barging point will only be operated in the daytime, there will not be glare at nighttime at the barging point.