Project meeting in time, solve the technical difficulties in the process of construction, engineering technical personnel should be regularly to the construction site and construction personnel, research and solve the technical problems encountered in construction, team construction, the construction unit and a half months held once a week on, summarize and popularize advanced construction method, project joint meeting every week production dispatch meetings, inspection, summarizes the construction situation, promotion of advanced construction method, according to the actual situation, adjust the construction power, perfect the construction scheme and method, make the construction smoothly, to ensure that the time limit for a project.