本工程采用DCS自动控制系统,大大降低劳动强度、减少人工,从而节约运行管理费用。为延缓膜的污堵,膜生物反应系统采用恒液位出水方式,产水泵入口的英语翻译

本工程采用DCS自动控制系统,大大降低劳动强度、减少人工,从而节约运行

本工程采用DCS自动控制系统,大大降低劳动强度、减少人工,从而节约运行管理费用。为延缓膜的污堵,膜生物反应系统采用恒液位出水方式,产水泵入口设置调节阀。出水管路上设置孔板流量计,通过设定流量与检测流量的比较,自动控制膜生物反应产水泵的运行频率,从而保证膜系统的恒液位出水。产水泵入口设置压力变送器,压力变送器用来监测跨膜压差,当跨膜压差达到设定值(25kPa)后进行报警并自动停泵,提示操作者手动启动恢复性反洗程序,以保证膜系统不受损害。膜组件底部设有空气吹扫系统,连接吹扫风机,受DCS程序控制。正常工作时为连续吹扫,当系统进入在线化学清洗程序时,吹扫系统暂停,清洗结束时,自动开始运行。膜生物反应产水泵间歇运行,由DCS组态,实现自动控制运行。产水泵与吹扫风机联锁,当风机停止工作时,产水泵不能被启动。膜池设置静压式液位计,在膜池液位低于膜组件保护液位时,进行报警并联锁停泵,在膜池液位达到设定高液位时报警,保证膜池液位稳定。回流污泥和剩余污泥管道上设置流量计,实时监测回流污泥量和剩余污泥排放量。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
This project adopts DCS automatic control system, which greatly reduces labor intensity and labor, thereby saving operation and management costs. In order to delay the fouling of the membrane, the membrane biological reaction system adopts a constant liquid level water outlet method, and a regulating valve is installed at the inlet of the water production pump. An orifice flowmeter is installed on the water outlet pipeline, and the operating frequency of the membrane bioreaction water production pump is automatically controlled by comparing the set flow with the detected flow, so as to ensure the constant liquid level of the membrane system. <br>A pressure transmitter is installed at the inlet of the water production pump. The pressure transmitter is used to monitor the transmembrane pressure difference. When the transmembrane pressure difference reaches the set value (25kPa), it will alarm and automatically stop the pump, prompting the operator to manually start the restorative backwash program , To ensure that the membrane system is not damaged. There is an air purge system at the bottom of the membrane module, which is connected to a purge fan and is controlled by the DCS program. It is continuous purge during normal operation. When the system enters the online chemical cleaning program, the purge system is paused, and when the cleaning ends, it automatically starts running. The membrane bioreaction water production pump runs intermittently and is configured by DCS to realize automatic control operation. The production water pump is interlocked with the purge fan. When the fan stops working, the production water pump cannot be started. <br>The membrane tank is equipped with a static pressure level gauge. When the liquid level of the membrane tank is lower than the protection level of the membrane module, an alarm will be issued and the pump will be locked in parallel. When the liquid level of the membrane tank reaches the set high level, an alarm will be issued to ensure the liquid level of the membrane tank. Bit stable. Flow meters are installed on the return sludge and surplus sludge pipelines to monitor the return sludge volume and residual sludge discharge volume in real time.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The project adopts DCS automatic control system, which greatly reduces labor intensity and labor, thus saving operating and management costs. In order to delay the fouling of the membrane, the membrane bioreactive system adopts the constant liquid level water outlet method, and the water production pump inlet is set up to regulate the valve. The hole plate flow meter is set up on the outlet line, and by setting the flow rate and the detection flow, the running frequency of the membrane bioreaction production pump is automatically controlled, so as to ensure the constant fluid level of the membrane system.<br>The water production pump inlet is set up pressure transmitter, pressure transmitter is used to monitor the cross-film pressure difference, when the cross-film pressure difference reaches the set value (25kPa) after the alarm and automatically stop the pump, prompting the operator to manually start the restorative anti-washing procedure to ensure that the membrane system is not damaged. The bottom of the membrane assembly is equipped with an air-sweeping system, which is connected to the blow-off fan and is controlled by the DCS procedure. When working normally, continuous sweep, when the system enters the in-line chemical cleaning program, the blow-sweeping system is suspended and automatically starts running at the end of cleaning. Membrane bioreactive water production pump intermittent operation, by DCS configuration, to achieve automatic control operation. The water pump is interlocked with the blow-off blower, and the pump cannot be started when the fan stops working.<br>Membrane pool set static pressure level meter, when the membrane pool level is lower than the membrane component protection level, alarm and interlock stop pump, when the membrane pool level reaches a set high level alarm, to ensure that the membrane pool level is stable. Flow meters are set up on reflux sludge and residual sludge pipes to monitor the amount of reflux sludge and residual sludge emissions in real time.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
DCS automatic control system is adopted in this project, which greatly reduces labor intensity and labor, thus saving operation and management costs. In order to delay the fouling and plugging of membrane, the membrane bioreactor system adopts the constant liquid level effluent mode, and the inlet of the product water pump is equipped with a regulating valve. An orifice flowmeter is set in the outlet pipe. By comparing the set flow rate with the detected flow rate, the operation frequency of the membrane bioreactor water pump is automatically controlled, so as to ensure the constant liquid level of the membrane system.<br>A pressure transmitter is set at the inlet of the product water pump. The pressure transmitter is used to monitor the transmembrane pressure difference. When the transmembrane pressure difference reaches the set value (25kpa), it will give an alarm and stop the pump automatically, prompting the operator to start the recovery backwashing program manually, so as to ensure that the membrane system will not be damaged. An air purge system is set at the bottom of the membrane module, which is connected with the purge fan and controlled by DCs program. When the system enters the on-line chemical cleaning procedure, the purging system will stop and start to run automatically after cleaning. The water pump of membrane bioreactor runs intermittently and automatically controlled by DCS configuration. The product water pump is interlocked with the purge fan. When the fan stops working, the product water pump cannot be started.<br>The static pressure liquid level meter is set in the membrane tank. When the liquid level of the membrane tank is lower than the protection liquid level of the membrane module, the alarm is given and the pump is stopped by interlocking. When the liquid level of the membrane tank reaches the set high level, the alarm is given to ensure the stability of the liquid level of the membrane tank. Flowmeters are set on the return sludge and excess sludge pipes to monitor the amount of return sludge and excess sludge discharge in real time.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: