To send you the xls file of the ADST is useless. I would explain you why.The ADST includes all the components of the equipment/machine. What you’ve to consider is that the equipment have been shipped pre-assembled as much as possible. The packing list shwos the pre-assembled item/group, not the single component of it. This means that some components of the materials listed in the ADST have been pre-assemnled, while some other have been shipped loose.Anyway, to check the correspondence of the shipped equipment with the ADST, is possible trough the summary of the various packing list.You can compare the supply of each item/sub item or group/sub group of the equipment with the ADST and the summary of the packing list, marking each part once recognized.I attach, for your use and reference, the xls summary of all the packing list, which contains all the equipment shipped up today, included the one (n. 18) which is leaving today from Italy.