On December 9, through field analysis of the faulty car, it was found that the z-direction deviation of the handrail installation point on the left front wall of the BIW was 2mm. In the later stage, R & D was required to give the improvement direction and control standard to the BIW factory, and the BIW factory was responsible for the specific improvement of the BIW<br>
正在翻译中..