南广场留问题车辆,拉动采购、设计、制造共同分析要求对“玻璃升降挤压限位胶墩”单独记录。留故障车拉动制造、设计、外检进行分析对供应商来件状态和的英语翻译

南广场留问题车辆,拉动采购、设计、制造共同分析要求对“玻璃升降挤压限位

南广场留问题车辆,拉动采购、设计、制造共同分析要求对“玻璃升降挤压限位胶墩”单独记录。留故障车拉动制造、设计、外检进行分析对供应商来件状态和RDC送货状态进行对比,调查问题产生的根本原因。模拟装车接头进行气密性试验。发联系单给设计,要求管和手柄球分开供货线上试验100台车,接头100%检测力矩,验证漏气数据
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The problematic vehicles were kept in the South Square, and the joint analysis of procurement, design and manufacturing <br>required separate records of the "glass lift squeeze limit rubber piers". <br>Leave the faulty car to drive manufacturing, design, and external inspection to analyze <br>the status of the supplier's incoming shipment and the RDC delivery status to investigate the root cause of the problem. <br>Simulate the air tightness test of the loading joint. <br>Send a contact form to the design, requesting that the pipe and the handle ball be separately <br>tested on 100 vehicles on the supply line, and the joint is 100% tested for torque, and the air leakage data is verified
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
South Plaza left problem vehicles, pull procurement, design, manufacturing common analysis.<br>Requires a separate record of the "glass lift squeeze limit glue".<br>Leave the fault car pull manufacturing, design, external inspection analysis.<br>Compare the supplier's incoming status with the RDC delivery status to investigate the root cause of the problem.<br>Simulated loading joints for air tightness testing.<br>Issue contact order to the design, requires the tube and handle ball separate supply.<br>On-line test 100 cars, connector 100% detection torque, verify the leakage data.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
South Plaza to leave problem vehicles, pull procurement, design, manufacturing joint analysis<br>It is required to record the "glass lifting extrusion limit rubber pier" separately.<br>The manufacturing, design and external inspection of the fault vehicle are analyzed<br>Compare the supplier's incoming status with RDC delivery status, and investigate the root cause of the problem.<br>The air tightness test was carried out by simulating the loading joint.<br>Send the contact list to the designer, and require the pipe and handle ball to be supplied separately<br>On line test of 100 vehicles, 100% detection torque of joints, and verification of air leakage data<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: