The production of 500 g cans is known to be 1000 tons, while the ratio of 500 g canned products to 500 g bagged products is 3:1, so the annual production of canned products is 750 tons, bagged products 250 tons. Considering that before and after the production of equipment removal and cleaning and disinfection cost 2 hours, replacement phase of the product cost 1 hour, as well as the production workshop clearance treatment, it takes about half an hour, and then consider the machine failure repair time, you can know that the actual production time is only 5 to 6 hours per day.
正在翻译中..