The site elevation network should be closed and verified with accuracy based on the elevation control points provided by the city planning department, and a set of elevation control networks should be laid. At least three control points are entered and measured in the field area and added according to actual needs to measure the building height control network. The error in the center of the height of the support system is adjustable within 30 mm.