Eight, the operation method<br>1, the product with a shelf fixed to the wall between the equipment or placed in a specific (dry, smooth, good cooling) position;<br>2, the product's intake and outlet on the silicone hose;<br>3, the silicone pipe of the ozone intake is connected to the exhaust end of the ozone exhaust gas (such as the exhaust outlet of the reaction tank, the pipeline of ozone exhaust);<br>4, the ozone exhaust processor outlet (treated exhaust) connected to the end of the silicone hose to the position to be discharged, the location can not be easily accessed;<br>5, connect the power cord of the equipment;<br>6, according to the development of work time, to be completed, turn off the power switch;
正在翻译中..