Important:<br>1. The production materials of the whole machine shall be subject to the actual work order issuance.<br>2. After the maintenance machine (disassembly) is repaired and assembled, it shall be connected in A7 process.<br>3. After the maintenance machine (not disassembled) is repaired, it is connected in A10 process.
正在翻译中..