In the process of pouring concrete, attention should be paid to the protection of the reinforcement, and it is not allowed to trample on the reinforcement, collide with the reserved water and electricity holes, and embed the pipeline. Timely clean up the laitance on the steel bars of the wall and column protruding from the formwork, or cover the steel bars with PVC pipes or wrap plastic films.<br>
正在翻译中..