A long of 8 times of diameter of tested piles with width of 2 times of diameter and depth of 40cm cuboid should be excavated prior to test. The soil within ranging of 4 times of diameter of pile to 6 meter from pile center should be strengthened. The strengthened soil range shall be not less than the area of buttress covered.