梁模板应在满堂脚手架的基础上,再将支承梁两边分别加上加密固定支承杆,底模立杆要直接支撑在小梁的横杆上面,侧模立杆应用短钢管及扣件来固定和加固的英语翻译

梁模板应在满堂脚手架的基础上,再将支承梁两边分别加上加密固定支承杆,底

梁模板应在满堂脚手架的基础上,再将支承梁两边分别加上加密固定支承杆,底模立杆要直接支撑在小梁的横杆上面,侧模立杆应用短钢管及扣件来固定和加固,固定梁底模及侧模时,同一根梁应拉统线,立杆不能直接支承在满堂楼板上,应在其下方放入垫木。梁模板应先铺设底板及一边侧模,待梁钢筋绑扎完毕并经验收人员验收合格后,再封另一侧模板。梁模板铺排时应从梁两端往中间节点倒退,使嵌木安排在梁中,以免出现柱梁节点缩颈的质量通病。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The beam formwork should be on the basis of the full house scaffolding, and then the supporting beams should be provided with encrypted fixed support rods on both sides. The bottom mold vertical rod shall be directly supported on the cross rod of the small beam, and the side mold vertical rod shall be fixed by short steel pipes and fasteners When fixing the bottom form and side form of the beam, the same beam should be pulled together, and the vertical poles cannot be directly supported on the full floor slab, and skids should be placed under it. The beam formwork should first lay the bottom plate and side formwork on one side. After the beam steel bars are bound and accepted by the acceptance personnel, the formwork on the other side should be sealed. The beam formwork should be laid backwards from the two ends of the beam to the middle node, so that the inlaid wood is arranged in the beam, so as to avoid the common quality problem of the column and beam node shrinkage.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Beam template should be on the basis of a full scaffolding, and then the support beam on both sides of the encrypted fixed support rod, the bottom mold pole to directly support the beam above the crossbar, side mold pole application of short steel pipe and fasteners to fix and strengthen, fixed beam bottom mold and side mold, the same beam should pull the unified line, the pole can not be directly supported in the full hall floor, should be placed under it pad wood. Beam template should first lay the bottom plate and side mold, waiting for the beam rebar tied up and experienced personnel acceptance pass, and then seal the other side template. When the beam template is laid, it should be regressed from both ends of the beam to the middle node, so that the embedded wood is arranged in the beam, so as to avoid the quality common disease of the column beam node shrink neck.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The beam formwork shall be on the basis of full hall scaffold, and the supporting beam shall be separately added with the encrypted fixed support bar. The bottom formwork upright bar shall be directly supported on the cross bar of the small beam. The side formwork vertical bar shall be fixed and reinforced by short steel pipe and fastener. When fixing the beam bottom formwork and side formwork, the same beam shall be pulled and unified. The vertical bar cannot be directly supported on the floor of the whole hall, and the cushion wood shall be placed under it. The beam formwork shall be laid with bottom plate and side formwork on one side, and the other side formwork shall be sealed after the beam reinforcement is bound and accepted by the acceptance personnel. When laying beam formwork, the beam shall be backward from both ends to the middle node, so that the embedded wood will be arranged in the beam to avoid the common quality defects of the neck shrinkage of the column beam joint.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: