Beam template should be on the basis of a full scaffolding, and then the support beam on both sides of the encrypted fixed support rod, the bottom mold pole to directly support the beam above the crossbar, side mold pole application of short steel pipe and fasteners to fix and strengthen, fixed beam bottom mold and side mold, the same beam should pull the unified line, the pole can not be directly supported in the full hall floor, should be placed under it pad wood. Beam template should first lay the bottom plate and side mold, waiting for the beam rebar tied up and experienced personnel acceptance pass, and then seal the other side template. When the beam template is laid, it should be regressed from both ends of the beam to the middle node, so that the embedded wood is arranged in the beam, so as to avoid the quality common disease of the column beam node shrink neck.
正在翻译中..