1. The problems of irregular gas pipe joint and inaccurate size of color code have been improved.<br>2. At present, the height valves of the three suppliers are not consistent, and a1331 (Ruili) has been arranged to suspend the supply. The procurement department should urge the supplier to rectify, and the a1890 will be improved after the rectification is qualified and the supply is resumed.<br>
正在翻译中..