Cantilever Construction Method because the ability to have a big leap, construction convenient, short construction period, a series of low cost advantage, high pier of the bridge across the river, extensive application of large span continuous beam. Closure of mature technology is an important prerequisite to improve the basis for the stability of the bridge, the bridge across the river is the key technology project, it is necessary to strengthen quality control. Introduces the construction and its impact and effect on the structure of the bridge collapsed section cantilever beam, and the actual project as an example to explore the hanging beam construction points irrigation Closure segment.
正在翻译中..