Hi all.Resume from the Meeting with supplier.Attach the Answers from the supplier.Activities perform WW33.3•Change of the valve as standard.•No testing perform Question pending to Answer by supplier•Why is it necessary to change the parameters so much? Being that in line 2 we are very close to the parameters defined by the material.•Pressures from A is higher, change the Hose will minimize the pressure, to balance.•The difference on the weight from the two recipes can affect the equipment behavior? •There is possible for the A Hydraulic side to degrade?•Yes, it is possible for one pump to degrade with the use.•Why is necessary to change Hose for a bigger one? since on line 2 is running correctly•What will be the next action if we change the Hose with bigger diameter and the equipment keep failing?•There is any recordable incident like this on another factory?•No standard design, Our design is different•The total weight can affect the equipment since 66c dispense 13g and 72c dispense 54 g?•It is possible to that the VDF is the one that is Causing this issue with the pressures? We need to change it?•Can you what are the parameters that influence on the calculator on the dispense?•It is possible to increase the pressure from the B side?•To increase the value of the B pressure is required to modify the hardware.•It is possible that and output of the PLC is failing and that cause the Error? •No is not possible Pending Activities to Perform•Change the Hose for a bigger One. (waiting for the Item for testing)•Connect to the PLC remotely to verify the Software.•Verify the VDF parameter/Configuration.•From Jincheng to send the Software and Cable required to connect to the PLC Saludos.