1.How to maintain the lower bearing long studbolts outside lower slewing in future to be suggested by HCN ME(safety harness connection) 2.The railing height on the inner side is to be increased 3.Slewing platform access bolts already been torqued, but there is still a gap between the flanges requested to be fixed