Hazens inspected the situation of newly added and changed soil source projects. Before the earthwork was loaded, the large-sized stones were selected and sieved.
Hazens inspected the newly added soil source project and the soil quality changed. Before the earthwork loading, measures were taken to select and screen the large size stones.<br>