做好技术准备。收到施工图纸后,预算员、施工员等有关人员要认真熟悉图纸,了解设计意图,并注意图纸上存在的问题,做好记录,准备好图纸会审,力争把的英语翻译

做好技术准备。收到施工图纸后,预算员、施工员等有关人员要认真熟悉图纸,

做好技术准备。收到施工图纸后,预算员、施工员等有关人员要认真熟悉图纸,了解设计意图,并注意图纸上存在的问题,做好记录,准备好图纸会审,力争把这些问题在施工前彻底处理。施工员在此基础上进行测量放线,质检人员应做好复测工作,并做好验线准备。预算人员提出各种材料计划,交施工负责人安排组织进场和加工。施工员应对各工种做好技术、质量、安全交底,并准备好各种资料表格,以保证资料形成及时可靠。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Be technically prepared. After receiving the construction drawings, the budgeter, construction staff and other relevant personnel should carefully familiarize themselves with the drawings, understand the design intent, and pay attention to the problems on the drawings, make records, prepare for the drawing review, and strive to thoroughly deal with these problems before construction. On this basis, the construction staff shall carry out the measurement and setting-out, and the quality inspection personnel shall do the re-test work and prepare for the line inspection. The budget staff put forward various material plans and handed them over to the person in charge of construction to arrange for entry and processing. Construction workers should make technical, quality, and safety clarifications for each type of work, and prepare various data forms to ensure that the data is formed in a timely and reliable manner.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Be technically prepared. After receiving the construction drawings, budgeters, construction workers and other relevant personnel should be seriously familiar with the drawings, understand the design intention, and pay attention to the problems on the drawings, do a good record, ready drawings triage, and strive to put these issues before the construction of thorough treatment. On this basis, the construction staff to carry out the measurement line, the quality inspection personnel should do a good job of retesting, and do a good job of line inspection preparation. Budget staff put forward a variety of material plans, the construction of the person in charge to arrange the organization of entry and processing. Construction workers should do a good job in each type of work technology, quality, safety, and prepare a variety of information forms to ensure that the formation of timely and reliable data.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Make technical preparations. After receiving the construction drawings, the budgeters, constructors and other relevant personnel should be familiar with the drawings, understand the design intention, pay attention to the problems existing in the drawings, make records, prepare for the joint review of the drawings, and strive to thoroughly deal with these problems before construction. On this basis, the construction workers should carry out the measurement and setting out, and the quality inspection personnel should do a good job of re measurement and make preparations for line inspection. The budget personnel shall put forward various material plans and submit them to the person in charge of construction to arrange the mobilization and processing. The construction workers shall make technical, quality and safety disclosure for each type of work, and prepare various data forms to ensure timely and reliable data formation.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: