Be technically prepared. After receiving the construction drawings, budgeters, construction workers and other relevant personnel should be seriously familiar with the drawings, understand the design intention, and pay attention to the problems on the drawings, do a good record, ready drawings triage, and strive to put these issues before the construction of thorough treatment. On this basis, the construction staff to carry out the measurement line, the quality inspection personnel should do a good job of retesting, and do a good job of line inspection preparation. Budget staff put forward a variety of material plans, the construction of the person in charge to arrange the organization of entry and processing. Construction workers should do a good job in each type of work technology, quality, safety, and prepare a variety of information forms to ensure that the formation of timely and reliable data.