对场地密封沟周边进行探摸,确定粘土止水帷幕的深度和位置,止水帷幕采用双排粘土密封墙,有效厚度约1 m,深度约8~9 m。探摸的方法是在搅拌桩的英语翻译

对场地密封沟周边进行探摸,确定粘土止水帷幕的深度和位置,止水帷幕采用双

对场地密封沟周边进行探摸,确定粘土止水帷幕的深度和位置,止水帷幕采用双排粘土密封墙,有效厚度约1 m,深度约8~9 m。探摸的方法是在搅拌桩施工中线上按50 m间距布置探摸点,透水层深度变化较大的或存在中粗砂层的区域,探摸点距离按20 m间距布置。探摸结束后,整理绘制搅拌桩施工图,以做泥浆搅拌桩施工深度参考图。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Explore the periphery of the site's sealing ditch to determine the depth and position of the clay water-stop curtain. The water-stop curtain adopts double-row clay seal wall with an effective thickness of about 1 m and a depth of about 8-9 m. <br>The method of exploration is to arrange the exploration points at a distance of 50 m on the midline of the construction of the mixing piles. The areas where the depth of the permeable layer changes greatly or there are medium and coarse sand layers are arranged at a distance of 20 m. After the exploration is completed, the construction drawing of the mixing pile is arranged and drawn to make a reference map for the construction depth of the slurry mixing pile.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
To explore the perimeter of the site sealing ditch, determine the depth and position of the clay water curtain, the stop curtain using a double row of clay sealwall, the effective thickness of about 1 m, depth of about 8 to 9 m.<br>The method of exploration is to lay the exploration point according to the 50 m spacing on the mid-line of the stirring pile construction, the depth of the permeable layer changes greatly or the area where the coarse sand layer exists, and the distance of the exploration point is arranged according to the 20 m spacing. After the exploration, the construction drawing of the mixing pile is arranged to make the deep reference map of the mud mixing pile construction.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The depth and position of the clay water stop curtain shall be determined by exploring the surrounding of the site sealing ditch. The double row clay sealing wall shall be used for the water stop curtain, with an effective thickness of about 1 m and a depth of about 8-9 M.<br>The exploration method is to arrange the exploration points on the middle line of the mixing pile construction according to the spacing of 50m. For the areas where the depth of permeable layer changes greatly or there is medium coarse sand layer, the exploration point distance is arranged according to the spacing of 20m. After the exploration, the construction drawing of the mixing pile shall be arranged and drawn to make the reference drawing of the construction depth of the mud mixing pile.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: