The unit operates pumps and stirs about 50 units online, based on the above-mentioned energy-saving measures, combined with the production layout of the device, to carry out detailed analysis and design of each unit process, to the best working point of the device as the benchmark, optimize the equipment flow, head and mass transfer, heat transfer technology selection parameters, reduce the invalid power output, is expected to save 20-40kW power.
正在翻译中..