Before the construction of water conservancy and hydropower projects, the general scheme of construction design is not detailed enough, and the objectives are not determined according to the actual situation, which leads to the unscientific problems in the design of water conservancy and hydropower projects, and many unreasonable places appear, which are inconsistent with the relevant requirements of water conservancy and hydropower engineering construction standards, and neglect the design schemes Compared with each other, the water conservancy and hydropower projects are not in place of construction arrangements, resources can not be effectively used and other problems, to the normal construction of water conservancy and hydropower projects bring greater security risks and quality problems. The deficiency of enterprise management is a very serious problem that the design level of water conservancy and Hydropower Engineering cannot be effectively improved, which affects the effective implementation of the construction organization design of the whole water conservancy and hydropower project<br>
正在翻译中..