16.3.2 Functional test 2 shall be performed before and after the test sequence. Before and after each test a 16.3.5 visual inspection of the DUT shall be performed. Minimum numbers of one sample per test shall be performed. Requirement numbers need to be updated. Test sequence is preliminar.