Renovation of the secondary blast drilling system of rock in open-air quarrying<br>Liu Liqing<br><br>(Xinling Coal Mine Heilongjiang Hegang 154106)<br><br>Abstract After the blasting of open-air perforation operation, some of the larger rocks produced 0.5m3-1.5m3, which could not be<br>Normal loading, the rock needs to be secondary drilling, loading, blasting, the system's original press, power source for the car engine, start-up by the driver's foot throttle, air pressure instability, often occur the phenomenon of drill pipe, and equipment aging, low efficiency, high failure, can not meet production needs. After the system transformation, one-click start blower, easy to operate, reduce the labor intensity of workers, low energy consumption, improve efficiency, high safety.<br><br>Keywords Rock secondary blasting Compus press Yuchai engine one-click start
正在翻译中..