After the tower foundation reaches the specified strength, it should be verified whether the size of the embedded bolts in the foundation meets the design and specification requirements, and the column should be checked for quality requirements and transported to the vicinity of the foundation.<br>Tie the swinging rope 400mm below the lifting rope, and at the same time, it should not be more than 800mm from the top of the column.
正在翻译中..