The project entails construct and install a new carbon steel rubber lined (54%) concentrated phosphoric acid tanks farm, five storage tanks each tank with effective capacity (6500) m³, one maturation tank with effective capacity (5000) m³ and one settler with effective capacity (2500) m³ with all accessories and facilities including designing, engineering, procurement, supplying of materials and services, construction of civil works, foundation, dike wall, pipe racks, steel structure, piping systems and supplying other associated facilities including pumps, agitators, rakers, valves motors, gears .. etc., fabrication of tanks, rubber lining and brick lining works, all mechanical & electrical and instrument work, surface preparation & painting, tiein to the existing system, erection, inspection & testing, commissioning, training and start up.