The placement of the coils depends on the size of the platform itself. The option of placing 4 coils in 4 levels is definitely not suitable, since this leads to the need to raise the coils by almost 4 m.Options of 4 coils in 2 levels in one direction or 4 coils in 1 level when loading from both sides depends on minimizing the area, depending from the area of the rest of the equipment and the convenience of loader access to the unwinder