Most Design-Build projects, including even Develop and Construct, have a negotiation period between the tender and the award of the contract, and to that extent they all have two pre-contract stages. However, with DesignBuild (two-stage tender), employers deliberately frame their enquiries such that a second stage of design and pricing is inevitable before the contract can be agreed.