Please should be indicated electrical and instrumentation cable routing layout. Local panel also should be indicated. If external industrial sockets are required for maintenance work, they should also be included in the plot plan.If the power goes out suddenly, is the UPS provided for the control devices only to shut down the plant normally? What are the risks if the devices suddenly lose power?In the previous layout drawing, you planned one chimney for screening and grinding. It is not clear in current layout, please explain where and how it is planned to be installed.