Special tips<br><br>1. During installation or idle operation, in order to prevent the pressure rust of bearing bearing point, please refuel the two main bearings every half a month, start running for 2 minutes or move the drum by hand 20 turns.<br>2. The feed pump or feed valve must be closed before stopping. Never allow inding or water after shutdown. Prevents fluid from flowing into the bearings, causing bearing damage.<br>3. At the end of each work, the machine must be cleaned and must not contain material in the drum. Before cleaning is complete, close the inlet water pump or inlet valve before closing.<br>4. Cleaning method: machine speed to 1500 rpm or more, into the water operation 2-3 minutes, stop. Wash it repeatedly several times until the outlet is clear.<br> Note: The amount of cleaning water must not be too large (the feeding tube must not appear the phenomenon of running water)<br>5. When removing the centrifuge, it is forbidden to hit directly with a hammer. It is prohibited to process parts of centrifuges at high temperatures such as electric welding and gas cutting.
正在翻译中..