In this paper, Zhoukou City, Xihua County Pacific West Washington Building 1 building as an example, combined with the actual situation, the construction project construction organization design, the use of the knowledge of the construction project from the construction work start preparation to the end of the project to make detailed arrangements. Develop the corresponding construction plan, in the project process arrangements are orderly, in the organization of personnel in an orderly manner, in the construction equipment management to do clean and tidy, in the construction of the materials required to do a neat stack, the construction process, as far as possible to reduce dust, noise pollution. The construction personnel to carry out the necessary safety construction training and civilized construction training, and strive to achieve early completion at the same time to ensure quality and reputation of the double harvest. Effective control of construction costs and duration, saving construction input.
正在翻译中..