Hotel plots for greening, drainage ditch construction, area 1 according to the status quo of the site gradually carry out pumping and drainage, clearing tables, barrier clearance operations, 2 district fence construction, 3 area is to complete the pumping part of the bottom of the pond soil technical confirmation;
正在翻译中..