工程竣工资料管理是工程建设过程中不可缺少的重要工作,是一项系统工程。为确保工程竣工资料完整、准确、系统、完整、真实,记录和反映施工验收全过程的英语翻译

工程竣工资料管理是工程建设过程中不可缺少的重要工作,是一项系统工程。为

工程竣工资料管理是工程建设过程中不可缺少的重要工作,是一项系统工程。为确保工程竣工资料完整、准确、系统、完整、真实,记录和反映施工验收全过程,必须不断加强工程管理水平。施工单位、监理单位和施工单位,为一级施工提供资料保护。如现场技术交底、图纸会审、设计变更文件、施工记录(焊接记录、天气情况、日期、操作人员等)、各类报验单、签证单等,均按规定格式装订,竣工验收后,按照规定的卷册格式,分类归档,便于以后检索和追溯。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Data management is the completion of the project construction process indispensable work, is a systematic project. To ensure completion of the project information is complete, accurate, systematic, complete, true and construction inspection record and reflect the whole process, we must continue to strengthen project management. Construction units, supervision units and construction units to provide data protection for a construction. Such as on-site technical tests, examination of working drawing, document design changes, construction records (welding records, weather, date, operator, etc.), various types of post-mortem single, single visa, etc., shall be governed by binding format, after the final acceptance, in accordance with the provisions of the format volumes, classified filing, to facilitate later retrieval and traceability.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The project completion data management is an indispensable and important work in the process of engineering construction, and it is a systematic project. In order to ensure that the completion data of the project is complete, accurate, systematic, complete and true, and the whole process of construction acceptance must be recorded and reflected, the level of project management must be continuously strengthened. Construction units, supervision units and construction units shall provide information protection for the first-level construction. Such as on-site technical delivery, drawing triage, design change documents, construction records (welding records, weather conditions, dates, operators, etc.), all kinds of inspection documents, visa documents, etc., are bound in accordance with the prescribed format, after completion and acceptance, in accordance with the prescribed volume format, classification and archiving, easy to search and trace.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Project completion data management is an indispensable and important work in the process of project construction, which is a systematic project. In order to ensure that the completion data of the project is complete, accurate, systematic, complete and true, and to record and reflect the whole process of construction acceptance, the project management level must be continuously strengthened. The construction unit, supervision unit and construction unit shall provide data protection for the first level construction. For example, on-site technical disclosure, joint review of drawings, design change documents, construction records (welding records, weather conditions, dates, operators, etc.), all kinds of inspection application forms, visa forms, etc. are bound according to the specified format. After completion acceptance, they are classified and filed according to the specified volume format for later retrieval and traceability.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: