The third step: the mineral material ≤10mm enters the two chutes for ore beneficiation through the drum screen and the hopper, adjust the chute angle and water flow rate, and use the imported Mitsubishi gold carpet to recover gold.
The third step: mineral materials less than or equal to 10 mm are sent to two chutes for beneficiation through drum screen hopper. The angle of chute and water flow velocity are adjusted, and gold is recovered with imported Mitsubishi gold blanket.