For a long time we have learned how to put a way. Archaeologists discovered that in 4600 ancient Egypt used pyramid stones to pave the way. Later, the Romans used the same method to build a huge road network. The method has been used to this day. Some of these roads still play a role. If we follow the basic concept of laying roads, a sustainable road will be built. The following are the ten requirements for the construction of a road: (1) drain the road as much as possible (2) the foundation of the road surface must be stable (3) choose economical and reasonable paving materials (4) the level of the pavement must be compact and be reasonable (5) The maximum vehicle load of awell-designed road (6) Provide good design and maintenance (7) Prepare to be laid (8) Top-down (9) Budget your investment well (10) Keep a good record The foundation of the road has long been a method of paving a road. Archaeologists discovered that in 4600 ancient Egypt used pyramid stones to pave the way. Later, the Romans used the same method to build a huge road network. This method has been used to this day. Some of these roads still play a role.