With reference to Figure 1, the following sections are defined:• Section 1 (green circled): single link connected between neutral reactor XN(52)HVS.1 and MV/HVS test cells;• Section 2 (red circled): three-phase link feeding HVTR laboratory at 52 kV level;• Section 3 (blue circled): three-phase link connecting C(52)2 capacitor bank to test cells MV1 and MV3.The limit of supply is defined at cable terminals (included in the scope). Civil works are excluded from the Supply.This technical specification defines the conditions that power cables and accessories must satisfy regarding design, manufacture, characteristics, ratings and the qualification testing and approval to be implemented in order to establish their compliance with the specified requirements.The Supplier shall be in charge of all components and materials, including consumables, required to manufacture, assembly, install, connect and put into service the equipment as well as any ancillary works and anything else necessary to ensure full integration and functionality of equipment and safety conditions for people and equipment.