对于新的分包商,需要强调一下几个方面:1. 分包商资质和能力必须包括目前黄线上我们在施工的所有界面的能力,满足所有资质,比如TRA的熔纤和O的英语翻译

对于新的分包商,需要强调一下几个方面:1. 分包商资质和能力必须包括目

对于新的分包商,需要强调一下几个方面:1. 分包商资质和能力必须包括目前黄线上我们在施工的所有界面的能力,满足所有资质,比如TRA的熔纤和OTDR 按照客户要求的测试,所有的按照和接线,测试的能力等。2. 新的分包商需要综合评估我们所有给分包商的报价,并且能够接受客户和CCS的工作界面3. 分包商需要有足够的资源支撑和管理能力以适应对项目的所有要求。如果后期分包商入场后又对界面和价格提出质疑,我们视为违约处理,请和分包商详细说明。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
For new subcontractors, the following aspects need to be emphasized: 1. The qualifications and capabilities of subcontractors must include the capabilities of all the interfaces we are currently constructing on the yellow line, and meet all qualifications, such as TRA's fiber splicing and OTDR according to customers Required tests, all compliance and wiring, test capabilities, etc. <br>2. The new subcontractor needs to comprehensively evaluate all of our quotations to the subcontractor and be able to accept the work interface between the customer and CCS. <br>3. The subcontractor needs to have sufficient resource support and management capabilities to meet all the requirements of the project. <br>If the subcontractor later enters the market and raises doubts about the interface and price, we will treat it as a breach of contract. Please explain to the subcontractor in detail.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
For new subcontractors, there are several areas to highlight: 1. Subcontractor qualifications and capabilities must include the ability of all interfaces we are currently working on on the Yellow Line to meet all qualifications, such as TRA's melt fiber and OTDR's testing in accordance with customer requirements, all follow-up and wiring, testing capabilities, etc.<br>2. New subcontractors are required to evaluate all our offers to subcontractors in a comprehensive way and to be able to accept the working interface between the customer and CCS<br>Subcontractors need sufficient resources to support and manage capacity to meet all requirements for the project.<br>If a later subcontractor enters the market and then challenges the interface and price, we are treated as a default, please elaborate with the subcontractor.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
For the new subcontractor, we need to emphasize the following aspects: 1. The qualification and ability of the subcontractor must include the ability of all interfaces in the construction of the yellow line, and meet all qualifications, such as the testing of TRA's fused fiber and OTDR according to the customer's requirements, all the testing and wiring, testing ability, etc.<br>2. The new subcontractor needs to comprehensively evaluate all our quotations to the subcontractor, and be able to accept the work interface of the customer and CCS<br>3. The subcontractor needs to have sufficient resource support and management ability to adapt to all requirements of the project.<br>If the later subcontractor queries the interface and price after entering the site, we will treat it as a breach of contract. Please explain in detail with the subcontractor.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: